Electric Island
One switch design at every new home, transformer and line section, so a failing grid splits into islands of 1, 15 or 300 homes that run on their own solar and batteries.
Try the blackout drawing Inspect the 3D switch (opens in a new tab) Pitch deck (opens in a new tab)
Team project with Miles Silverman. We developed the concept in 48 hours, and Miles built the simulator afterward. Concept and rules-based simulation only, not tested on hardware.
- 12 scenarios run in the simulator with zero safety-rule failures
- 5.6× more home-hours powered with all-night caps than with none, on the hardest heat-wave night we modeled